Tunnel
12 November, 2022
In continuation to our announcement dated December 14 2018 we are pleased to inform you that the project Construction of Road Tunnel Viaduct and Churhat Bypass of Rewa- Sidhi section of NH-75E New NH-39 from chainage Km 33/200 to 55/400 (total design length 15.350 km) as Cement Concrete Pavement configuration in the State of Madhya Pradesh on DBOFT or HAM basis has been provisionally completed.
11 March, 2022
Dilip Buildcon Limited (DBL), a construction and infrastructure development company, has executed the engineering, procurement, and construction (EPC) contract with the Rail Vikas Nigam Limited (RVNL), Chandigarh, on March 04, 2022.
The project is for the construction of tunnels- T14, TLs, and T16.
30 November, 2021
The project involves construction of tunnels, bridges and formation works, including slope protection works and allied works in connection with Bhanupali-Bilaspur-Beri new railway line in district Bilaspur of Himachal Pradesh State on EPC mode.
The bid project cost is Rs 636.98 crore and the completion period is 24 months.
20 August, 2020
The share price of Dilip Buildcon gained over 10 percent in the early trade on Wednesday after the company received a letter of acceptance (LOA) from Rail Vikas Nigam.
20 August, 2020
DBL has received Letter of Award by the NHAI for a new hybrid annuity project valued at Rs 1,004 crore in Madhya Pradesh.
The project involves construction of road tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E in Madhya Pradesh on build, operate and transfer mode.
29 March, 2018
DBL has received Letter of Award by the NHAI for a new hybrid annuity project valued at Rs 1,004 crore in Madhya Pradesh.
The project involves construction of road tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E in Madhya Pradesh on build, operate and transfer mode.
NHAI
2.95 + 2.65
Completed
DBL undertakes Construction of Churhat Bypass including Tunnel on Riwa Sidhi section of NH 75E from chainage 33.200 to chainage 55.400 (design length 15.350km.) in the state of MP on Hybrid annuity Mode".
Rail Vikas Nigam Limited
7.995km
On Going
DBL undertakes construction of Tunnels, Bridges, Yard and formation works from chainage 117.365 To 125.320 (7.955 km) (FLS) under Package-9 in connection with new BG line between Rishikesh and Karanprayag (125 km) in the state of Uttarakhand.
NHAI
3.6
On Going
Construction of eight lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagoan Jageer village (Ch. 419+000 – 427+300) section of Delhi –Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan on EPC Mode. Tunnel Length: 3.6 KM
RVNL
4.5km
On Going
Construction of tunnels T14. T15 and T16, bridges and formation works from chainage 40+430 to 44+925, including slope protection works and allied work in connection with Bhanupali - BilaspurBeri new railway line in district Bilaspur of Himachal Pradesh State PKG 5
Website Best Viewed in Google Chrome & Mozilla FireFox in 1024 X 768 Screen Resolution