Tunnel

Highlighted Projects

Bhanupali - Bilaspur Beri Tunnel

Bhanupali - Bilaspur Beri Tunnel

Awarding Body:

RVNL

Length:

4.5km

Status:

On Going

Construction of tunnels T14. T15 and T16, bridges and formation works from chainage 40+430 to 44+925, including slope protection works and allied work in connection with Bhanupali – BilaspurBeri new railway line in district Bilaspur of Himachal Pradesh State PKG 5

Tunnel-BG Line between Rishikesh and Karanprayag

Tunnel-BG Line between Rishikesh and Karanprayag

Awarding Body:

Rail Vikas Nigam Limited

Length:

7.995km

Status:

On Going

DBL undertakes construction of Tunnels, Bridges, Yard and formation works from chainage 117.365 To 125.320 (7.955 km) (FLS) under Package-9 in connection with new BG line between Rishikesh and Karanprayag (125 km) in the state of Uttarakhand.

Churhat Bypass Tunnel - Rewa-Sidhi section of NH 75E

Churhat Bypass Tunnel - Rewa-Sidhi section of NH 75E

Awarding Body:

NHAI

Length:

2.95 + 2.65

Status:

Completed

DBL undertakes Construction of Churhat Bypass including Tunnel on Riwa Sidhi section of NH 75E from chainage 33.200 to chainage 55.400 (design length 15.350km.) in the state of MP on Hybrid annuity Mode”.

KotaTunnel Rajasthan

KotaTunnel Rajasthan

Awarding Body:

NHAI

Length:

3.6

Status:

On Going

Construction of eight lane access controlled Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagoan Jageer village (Ch. 419+000 – 427+300) section of Delhi –Vadodara Green field Alignment (NH-148N) under Bharatmala Pariyojana in the state of Rajasthan on EPC Mode. Tunnel Length: 3.6 KM

Featured Videos