Mining

Highlighted Projects

MDO (Mine Developer and Operator) Pachhwara by PSPCL

MDO (Mine Developer and Operator) Pachhwara by PSPCL

Dilip Buildcon Limited (DBL) in consortium with VPR Mining Infrastructure Private Limited has been awarded the contract of Mine Developer cum Operator (MDO) for the Development and Operation of Pachhwara Central Coal Block located at Rajmahal Coalfield, District Pakur, Jharkhand by Punjab State Power Corporation Limited (PSPCL).

As per the terms of contract DBL Pachhwara Coal Mines Private Limited (a Special Purpose Vehicle- SPV) was incorporated by DBL having shareholding of 74% and VPR having shareholding of 26% for execution of the project.

The Punjab State Power Corporation Limited (“PSPCL”) is the power generation and distribution company in the state of Punjab and is fully owned by the Government of Punjab. PSPCL owns 3 thermal power plants in the state of Punjab – Guru Nanak Dev Thermal Plant (Bathinda), Guru Gobind Singh Super Thermal Plant (Ropar) and Guru Hargobind Thermal Plant (Lehra Mohabbat) with installed capacities of 460 MW, 1260 MW and 920 MW respectively.

The Pachhwara Central Coal Block is located in the Pakur District of Jhakhand State having a balance reserve of 382.81 MT to be excavated for 55 years at a peak rated capacity of 7 MTPA. 

PSPCL MDO Contract Value: 32,156.04 Crores (Excluding Taxes)
Project Status: On Going

MDO (Mine Developer and Operator) Siarmal MCL

MDO (Mine Developer and Operator) Siarmal MCL

Awarding Body: Mahanadi Coal Fields Ltd.

Status: On Going

Description: Mine Developer and Operator (MDO) for development and operation of the Siarmal Open Cast Project of Mahanadi Coalfield Ltd. a subsidiary of Coal India Limited for 25 years.

Amadand OCP of SECL

Amadand OCP of SECL

Amadand OCP of SECL at Jamuna Kotam, Madhya Pradesh

Project Cost: र 26830.2 mn

Awarding Body: South Eastern Coalfields Ltd.

Project Status: On Going

Samaleswari OCP of MCL

Samaleswari OCP of MCL

Samaleswai Open Cast Mines Ob removal awarded by Mahanadi Coalfields Limited in the state of Odisha with a project cost of 10003.6 mn(including GST).

Project Status: On Going

Nigahi-3 OCP of NCL

Nigahi-3 OCP of NCL

DBL has developed core strengths like fleet/equipment management, bulk material handling, high volume excavation and earthwork, supply chain management etc. in its infrastructure and construction business. DBL’s expertise enjoys close synergy with the mining business.

Nigahi-3 Open Cast Mines is one of the most important projects of Northern Coal Field Limited with annual capacity of 17 MTPA. The project includes excavation of overburden of first dig (solid) & re-handling by mechanical means such as excavators, dumpers/tippers, drills, dozers, graders and water sprinklers for composite work consisting of blast hole drilling, excavation, loading, transportation of broken rocks/ soil/ earth, unloading/dumping, spreading, dozing, water sprinkling and grading etc. as per instruction of engineer-in-charge at specified places at Nigahi OCP of NCL.

Nigahi 3 Contract Value: 1798.93 Crores (Excluding GST @18%)

The time of completion for the work shall be 1552 days (51 Months).

Project Status: On Going

Khairagura OCP of SCCL

Khairagura OCP of SCCL

Kharagura is the flagship project of SCCL and the largest producing mine in the area. The project kicked off in November 2016 with a 3 years schedule for completion.

This project established DBL as a mining company and achieved a daily target of 100,000 BCM building an excavation capacity of 30 MBCM P.A. The project used best-in-class equipment for drilling, excavation, loading, transportation, dumping, spreading and levelling., of 1066.081 LCBM of overburden including coal with hired conventional equipment and additional works viz., 3000 dozer hours & 3000 shovel hours at Khairagura OCP, BPA area in a period of 36 months.

DBL has developed core strengths like fleet/equipment management, bulk material handling, high volume excavation & earthwork, supply chain management etc. in its infrastructure and construction business. The DBL expertise enjoys close synergy with the mining business.

As a part of diversification strategy and to exploit the existing strengths of the organization, DBL ventured into mining, bagging contracts of overburden/waste removal from Northern Coalfield Limited (NCL) and Sigareni Collieries Coal Limited (SCCL). In a very short span of 12 months, DBL has achieved an excavation capacity of 250,000 BCM per day in a cost efficient manner, establishing.

Status: Completed

Featured Videos